N 1253-12.1 Outstanding items from WG 2 meeting 25 Antalya, Turkey

ItemAssigned to / action (Reference document N 1034 - resolutions, and document N 1033 - minutes of Antalya meeting WG 2-25, and corrections to these minutes in section 3 of document N 1117)Status
AI-25-5 Japanese member body
a is requested to forward a set of bit maps and /or the outline of the corrected shapes reported in document N 1006 and document N 1014 along with a blown-up (96x96) hard copy to the editor.
Note: Japan needed more information from the project editor regarding fonts. See discussion under section 8.1.2 in WG 2-M26 minutes document N 1117.

First choice is True Type, or any Outline Font that can be converted to True Type; Last choice is 96x96 bit maps. The set is to be sent to Mr. Mike Ksar.

In progress;
M29: No further progress
AI-25-6 Korean member body
is requested to forward the set of bit maps, and or the outline of the corrected shapes of the characters in defects in document N 975, along with a blown-up (96x96 bits) hard copy to the editor.

Korea will attempt to speed up the availability of fonts.

In progress;
M29: No further progress
AI-25-8 Indian member body
is invited to prepare a defect report asking for the appropriate editorial change regarding references to ISCII 1991 - following the JTC 1 Defect Reporting procedures (and forms).M29: No action since M25;
Dropped
AI-25-10 Chinese member body
a is requested to study this possibility of composition to reduce the number of characters of the Yi script in document N 965 that needs coding in the BMP.Under study;
M29: Target M30
b is requested that China and Mongolia get together and come up with an agreed upon joint proposal between the two by the next WG 2 meetingM29: Mongolia has become a P member since. See M29 agenda item 8.4 on Mongolian; Closed
N 1253-12.2 Outstanding items from WG 2 meeting 26, San Francisco, CA, USA

ItemAssigned to / action (Reference document N 1118 - resolutions, and document N 1117 - minutes of San Francisco meeting WG 2-26, and corrections to these minutes noted in Section 3 of document N 1203)Status
AI-26-6 IRG (Mr. Akio Kido)
to take necessary action in IRG with reference to resolution M 26.4 regarding 5-column layout of Han block.M29: Completed; subject to verification by WG2
AI-26-8 Ms Joan Aliprand - Liaison to TC 46
to take parts related to TC 46 in document N 1071 for formal submission as liaison document by TC 46 along with the completed Proposal Summary Form.M29: Mr. Arnold Winkler tried to reach Ms. Aliprand; Outstanding
AI-26-9 Mr Alan Griffee - Liaison to SC 18 WG 8
to convey to SC 18 WG 8 that their Math symbols proposal be resubmitted along with the completed Proposal Summary Form. The original request was submitted prior to publication of 10646.In progress;
M29: Mr. Winkler contacted Mr. Griffee; Information has been sent to Convener; Completed
AI-26-11 Mr Johan W. van Wingen
b is invited to prepare contributions on Railway users that he volunteered to prepare during the meeting.In progress;
M29: No further progress
AI-26-13 Mr Michael Everson and Canada
With reference to document N 1104 on Canadian Aboriginal syllabics, to work with Canadian member body (and CASEC) and get agreement on a common position.In progress;
M29: Further discussion ongoing; Target M30
AI-26-14 Mr Hugh McGregor Ross and Canada
With reference to document N 1073 on Canadian Aboriginal syllabics, to work with Canadian member body (and CASEC) and get agreement on a common position.In progress;
M29: Further discussion ongoing; Target M30
N 1253-12.3 Outstanding items from WG 2 meeting 27, Geneva, Switzerland

ItemAssigned to / action (Reference Meeting 27 Resolutions document N 1204, Unconfirmed Meeting 27 Minutes in Document N 1203, and corrections noted in section 3 of document N 1253)Status
AI-27-2 Convener, Mr. Mike Ksar
a to contact TC173/SC4 to get more information on their Braille standard (CD/DIS).Outstanding;
M29: Prof. Shibano has contacted Japanese NB counterpart; New AI from M29 on Convener; Closed
g With reference to disposition of document N 1087-3 in document N 1114, SC 22/WG 3 was to provide a proposal summary form to WG 2. The convener should respond to SC 22/WG 3 (APL) alerting of this requirement from WG 2.Outstanding;

M29: See agenda WG29-8.1; Dropped

i to prepare a revised proposal for the joint working of ECMA TC1 and WG2 for discussion at the next WG 2 meeting taking into consideration the input received so far and the comments at the meeting.In progress
k to work with Danish Standards and establish the rules and guidelines related to the world wide web on WG 2 and the proposed FTP site for distribution of WG 2 documents.In progress
AI-27-3 WG2 project editor and co-editor
a to take the necessary actions in accordance with the following resolutions:

M27.1 - pDAM 1 on UTF-16 - updating and further processing as a DAM in JTC 1

Registration of UTF-1 is in Progress;
Completed; DAM 4 ballot in progress
AI-27-5 IRG Rapporteur and IRG
a to consider Vietnam's request for CHU NOM script in document N 1127 in its work on Vertical Extension.Completed;
N 1261
b to review the TCA contribution document N 1182 and give their evaluation to WG 2 for consideration at the next WG 2 meetingCompleted
c to classify IRG's category A vertical extension repertoire document N 1178 into several priority groups for WG 2's consideration for inclusion or non-inclusion into the BMPCompleted;
N 1261
AI-27-6 Vietnamese Member Body, Mr. Michael Everson and Mr. Bruce Paterson
to work with the co-editor Mr. Bruce Paterson to answer the various questions that were raised during the meeting on the proposal for Cham script The questions and comments are being assembled by Mr. Everson, Ireland, on behalf of WG 2 and will be forwarded to the Vietnamese member body.In progress;
M29: No further progress
AI-27-10 Unicode Consortium (Dr. Asmus Freytag)
a to get Unicode Consortium feedback on document N 1143 - on Latin characters for Yoruba and Hausa - to Mr. Hugh Ross, to enable WG 2 to decide at its next meeting.Outstanding;
M29: No feedback; Dropped
AI-27-12 Mr Johan van Wingen, Netherlands
is invited to examine the standard for the need for any statements regarding conventions used for naming characters such as 'digits', 'letters', etc. and propose clarification texts -- see minutes item 6.1.2.2.In progress;
M29: No new progress
AI-27-13 Mr Hugh Ross, UK
a to get supportive requirements statements on his proposal for Yoruba and Hausa from the appropriate governments in Africa.In progress
b to get the needed confirmation regarding Arabic Letter TEHEH with bar for Urdu (proposed in document N 1144).Completed;
N 1213
AI-27-15 Mr Stefan Fuchs, Israel
b to bring a new contribution consolidating the previous proposals on conventions used for names in 10646, in light of the new proposed annex for additional information on character names etc.Completed;
N 1256 - pDAM-7
AI-27-16 All member bodies, liaisons and individual experts
a are encouraged to take note of document N 1183 from China on and participate in the discussion on ideographic components and composition.Completed;
See agenda item 9 of M29
N 1253-12.4 Outstanding items from WG 2 meeting 28, Helsinki, Finland

ItemAssigned to / action (Reference Meeting 28 Resolutions document N 1254, Unconfirmed Meeting 28 minutes in document N 1253, and corrections noted under section 3 of this document - document N 1303)Status
AI-28-1 Meeting Secretary - Dr. V.S. UMAmaheswaran
a to finalize the document N 1254 containing the adopted meeting resolutions and send a plain text and MS WORD formatted versions to the convener as soon as possible, for electronic distribution by the convener to the WG 2 membership and to SC 2.Completed;
Finalized document N 1254 was also submitted to SC 2 plenary in Helsinki
b to finalize the document N 1253 containing the unconfirmed meeting minutes and send to the convener for distribution to WG 2.Completed
AI-28-2 Convener, Mr. Mike Ksar
a to add a list of latest standing documents in the document register.Completed;
Documents N 1250 and N 1300; Standing documents are highlighted in Bold and Underscored
b to update document N 1212 based on comments received, and with WG 2 meeting 28's resolutions.Completed;
Revised document N 1212 was submitted to SC 2 Helsinki plenary
c per resolution M 28.9, to forward document N 1224 - 'An operational model for characters and glyphs' as the first draft text for a Technical Report to SC2 secretariat to be attached to an NP for balloting in JTC1.Completed;
N 1264
AI-28-3 Project Editor, Mr. Bruce Peterson
a per resolution M28.1 on defect report dispositions, to prepare editorial corrigenda, and add them to the collection in document N 1207, on the following item:

With reference to concerns expressed in document N 1214:
1FFA GREEK CAPITAL LETTER OMEGA WITH VARIA
1FFB GREEK CAPITAL LETTER OMEGA WITH OXIA
amend the graphic symbols the incorrect Prosgegrammeni mark (iota subscript) at the bottom right hand corner of the graphic symbols.

Completed;
Added to new document N 1223R
b per resolution M28.1 on defect report dispositions, to prepare editorial corrigenda, and add them to the collection in document N 1207, on the following item:

With reference to concerns expressed in document N 1214, add the following entries in Annex Q (Additional Information on Characters):

0189 LATIN CAPITAL LETTER AFRICAN D
This character is the capital letter form of the character
0256 LATIN SMALL LETTER D WITH TAIL

019F LATIN CAPITAL LETTER O WITH MIDDLE TILDE
This character is the capital letter form of the character
0275 LATIN SMALL LETTER BARRED O

Completed;
Added to new document N 1223R
c to finalize the contents of document N 1207 as a collection of editorial changes and forward it to SC2 secretariat for further processing by ITTF as editorial corrigenda to ISO/IEC 10646-1: 1993 (E).Completed;
New document N 1223R; Sent also to CEN for Information
d per resolution M 28.8 on Annex Q, to finalize the text of the Technical Corrigendum (on AE) to ISO/IEC 10646-1: 1993(E), based on the proposed text for Annex Q in document N 1206, including the initial set of 'additional information on characters' contained in document N 1206, and forward the corrected dCOR-1 (per resolution M27.6 in document N 1204) to the SC 2 secretariat for further processing by ITTF.Completed;
N 1264;
Convener to check with ITTF (Keith Brannon) on progress of Tech Corrigendum #1
e per resolution M28.2 on Hebrew Cantillation marks, to add the set of Hebrew Cantillation marks to Table 14, as proposed in document N 1217, and prepare a pDAM for further processing.Completed;
N 1256 - pDAM-7
f per resolution M28.3 on Vietnamese DONG symbol, to prepare a pDAM for further processing.Completed;
N 1256 - pDAM-7
g per resolution M 28.5 on Tibetan script, to prepare a pDAM on Tibetan, based on the draft text for pDAM to be provided by China and the Unicode Consortium, and forward it to the SC2 secretariat for further processing.Completed;
N 1255 - pDAM-6
h per resolution on M28.4 on Irish Gaelic characters, to add
1E9B LATIN SMALL LETTER LONG S WITH DOT ABOVE
with the glyph shown in document N 1132R, and prepare a pDAM for further processing.
Completed;
N 1256 - pDAM-7
i to update the cumulative list document N 1216, by adding the new characters that are accepted at meeting 28.Completed;
N 1258
AI-28-4 All national bodies, liaison organizations and individual experts
a to take note of the revised 'Principles and Procedures' document N 1252 for all future submissions of additions to the repertoire of ISO/IEC 10646.No further feedback
b to ensure that their ballot responses on pDAM-5 are returned on time.Completed
c to review and feedback on document N 1216 - A cumulative List of Repertoire Additions (that have been accepted by WG 2 so far).No feedback;
Closed
d to study the contribution in document N 1208 on Greek (Byzantine) musical notation system and feedback to the Greek national body.No feedback;
Agenda item 8.3 of M29; Dropped
e to review document N 1207, cumulative list of editorial corrigenda and feedback to WG 2.No feedback;
Closed
f to review document N 1194, disposition of 'non-editorial defect reports' and feedback to WG 2.No feedback;
N 1223R; Dropped
g to review document N 1241 'SC2/WG2 Summary of work items', and verify that the status of all work of WG2 is correctly captured.No new feedback;
Closed
h to review document N 1157 'Proposed SC2/WG2 administrative procedures and tools to enhance processing of SC2 WG2 program of work' and feedback to the Danish member body.No feedback;
Closed
i to review the documents document N 1171, document N 1231 and resolution M27.21 and feedback on the topic of 'translatability and uniqueness of 10646 names', at the next WG 2 meeting.Completed;
Documents N 1259, N 1260, N 1266, N 1269, N 1272, and N 1277
j to take note that electronic versions of all contributions are encouraged. However, they must be sent to the convener for placing on the WG 2 electronic distribution list server or the WG 2 ftp site.Noted; Closed
AI-28-5 China and the Unicode Consortium
a per resolution M 28.5 on Tibetan script, and with reference to the Tibetan proposal in document N 1238, to provide draft text for a pDAM on Tibetan to the editor, accommodating the results of the discussion at meeting 28.Completed;
Documents N 1242, N 1243, and N 1255-pDAM-6
AI-28-6 China and Egypt (Mr. Khaled Sherif)
a With reference to the discussion on document N 1225- proposal for Uyghur, Kazakh and Kirghiz in Arabic script, from China, Mr. Khaled Sherif is to prepare a document containing all the comments received during the meeting. China is to consider the feedback and resubmit the proposal.Completed;
N 1246
AI-28-7 China
a to consider document N 1226 in their work and discussion on Mongolian coding and to include MNISM to the list of interested parties to be consulted on the subject.Completed;
See agenda item 8.4 in M29
AI-28-8 Ireland (Mr. Michael Everson)
a with reference to resolution M 28.4, to provide the correct glyph for the 'LATIN SMALL LETTER LONG S WITH DOT ABOVE', to the editor, to assist in the preparation of the appropriate pDAM text.Completed;
N 1256 - pDAM-7
AI-28-9 Sweden (Mr. Olle Järnefors)
a to prepare a revised submission on Runic characters, based on the feedback at this meeting and earlier.In progress;
M29: Some feedback - document N 1262
AI-28-10 IRG (Rapporteur - Mr. Zhang Zhoucai)
a per resolution M28.11, to classify IRG's category A vertical extension repertoire referenced in document N 1236, into several priority groups for WG2's consideration for inclusion or non-inclusion into the BMP.Completed;
N 1261
AI-28-11 Japan (Mr. Takayuki Sato)
a With reference to document N 1220 on 'Issues List', to collect all the items that WG 2 may have missed and send to Dr. UMAmaheswaran to include in the Outstanding action Items list.Completed;
N 1278